Hi everyone,
I’m a freshman in Dynamo. I need your help to reduce my freshness :).
I’m in trouble with Schedule in Revit. I have a lot of schedules to calculate the value of: Site Coverage, Garden Area, Site Permeability with both in Area and Percentage.
Now I want to create a list of that total calculate Parameters, somethings like below:
SITE AREA_____________: X m2 (Get from Project Parameter on Area + Project Information)
SITE COVERAGE_______: X1 m2_________Y1% (Total value from Site coverage Schedule)
SITE PERMEABILITY____: X2 m2_________Y2% (Total value from Site Permeability Schedule)
GARDEN AREA________: X3 m2_________Y3% (Total value from Garden Area Schedule)
Could you please show me the right way to do?
Many thanks,