In preperation for my Workflow Part 2, I’ve looked at different posts and tried different things without success…what am I missing?Revit2Excel2Revit_WIP.dyn (54.6 KB)
This is what I’ve tried after doing it for every parameter… which didn’t work:
@Kulkul
I need all of them to be able to update when I run the script. The URL was to simplify the troubleshooting, so we get one right and reproduce it to the other parametersin the bigger graph. People are going to fillout and change data in the excel file during the whole project, so I need to be able to sync every parameter that will be in the schedules. This is my first script to get a grip on how to procede, then I will use this with all my other project schedules.
Anyone of these Type parameters can change and needs to be synced