Why not just use the Schedule Properties to do it. Are there many options and schedules?
When design options are enabled, a visibility/graphics tab becomes available for the schedule. It’s accessible through the properties palette.
Unless you change it there, schedules default to Primary Option.
FYI: this may not be possible per this post:
https://forums.autodesk.com/t5/revit-api-forum/how-do-i-get-and-set-the-view-design-option-override/td-p/4449249