Views, Sheets and Sun settings

Hi, I’m trying to duplicate views that go onto sheets. Each view duplicated needs to change the sun settings time +30min. Am i on the right track? struggling to figure out where i would link the sun settings into the duplicate views and getting them onto sheets. Thanks for any help

Not so bad but this won’t work that way. Here’s how to create a serie of views with different solar study frame numbers, considering that the solar study is correctly configured in Revit (pay attention to lacing and level in the last node):


Putting those views onto different sheets shouldn’t be very difficult…

1 Like