Hello, I am currently creating a Windows schedule, but I am using a non-conventional method where I manually place each window using elevation and dimension them individually for each level. Then I draw detailed lines using the dimension tool and group them, copy the groups, and paste them onto the next sheet for the next level. However, it is a tedious task and when I paste, I have to be careful because the levels are different and the pasted content ends up with level below.
In this case, it would be easier if I could copy all the detail groups on one sheet view and paste them onto the views on the next sheet. Is there a way to do this?
Below is what I’ve tried…