Change Titleblock Stamp Based on Revision

Im sure like most of you we stamp drawings with Preliminary/Construction etc. Occasionally on issue one will sneak through stamped Preliminary when its a Construction issue. Is there a way we could link Revision Numbers to update to the correct stamp?

It depends how your stamp is managed. Is it in the titleblock? Driven by sheet parameters? We need to see an example and what you have attempted to help properly.

Here is a rough exemple where the stamp is in the titleblock and driven with a on)off parameter,hope thats what you mean…

Revit_59sfSKOF5R