HI @bvs1982 ,
Hi @Nick_Boyts
Hi @jacob.small
thanks to your input in another post, I made a fist version of a graph that gets the visiblity of each element from an external timeliner.
I can check the appearance of each element, by entering a date.
I have two questions.
1.Before I add demolition of existing structure, does this appears compact & robust as a graph?
2.Altough the use of a visibility parameter is an easy method for instant viewing, is there an alternative thinkable to visualize several dates in the same model? Maybe something with external register where you simply tie a number of views to an external register with visibility settings on a certain date.
register appearance from timeliner.dyn (81.0 KB)
Kind regards,
Willem