Hi Everyone,
I’m pretty new to using Dynamo but I’m currently working on incorporating the responsibility of design into the model elements e.g Structural Columns have a Parameter called Lead & Co-ordinate - Structural Engineer etc. The idea of this stems from a case study I looked at involving a dispute to which sizes were changed on site due to limited space and a shaft wall was heavily damaged, the contractor and structural engineer were in a dispute over who was responsible. So my idea is to incorporate responsibility into the families that allow a dispute referee to extract a report of such items if something similar ever happened again.
Anyway, I wanted to ask as I wanted to create a ‘Date Created’ for each family which could serve in a dispute case regarding a delay for one team waiting for another etc. Or it could be used for a BIM manager keeping track of the models and maintaining a good work flow between all models in a BIM Level 2 situation.
Any help would be great, attached is an image of my failed attempt.