Guys ,
I have two Cad Survey files, one before construction and one after construction .
I need to calculate the Cut fill quantities, can i do this with dynamo ?
Why don’t you use the Graded Region command in the Revit UI for this?
Thanks Andreas,
The graded region wasn’t working for me, I think i found the problem , there was a point in the New phase that was outside the perimeter of the existing topo .
Thanks again for responding