How can I change Family(Pipe Accesories) in project with out alert?

In small project, changing family A to B is simple in dynamo.
but if that project is so big and there are a lot of Pipe Accesories, it need a lot of time and make diverse alert like disconnect, delete element etc…

How can I change Family(Pipe Accesories) in project with out alert?
rvt files that I have to change are 40 and there are 1000 Pipe Accesories at one file.

@jh.lee5YTTX ,

you have to integrate system update into your workflow. We got this issue too. Changing families means checking the systems too, regarding disconnection.