# Schedule Door Tags - Doors in Linked Model (BIM 360)

**URL:** <https://forum.dynamobim.com/t/schedule-door-tags-doors-in-linked-model-bim-360/28777>\
**Category:** Revit\
**Tags:** dynamo\
**Created:** [November 21, 2018, 7:25pm UTC](https://forum.dynamobim.com/t/schedule-door-tags-doors-in-linked-model-bim-360/28777 "2018-11-21T19:25:50Z")\
**Posts on this page:** 1\
**Showing post:** 15

<div class="post-metadata">

**Author:** ![Steven](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/steven/32/112504_2.png) [@Steven](https://forum.dynamobim.com/u/Steven)\
**Post date:** [December 5, 2018, 6:24pm UTC](https://forum.dynamobim.com/t/schedule-door-tags-doors-in-linked-model-bim-360/28777/15 "2018-12-05T18:24:44Z")

</div>

I tried to edit the python but I am not very good at it yet. This new method will give a single point at the center of the tag so you will need to make sure that is within the doors Bbox. I origanaly went with the min and max point to increase the chances but this should be fine.

 ![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/0/0/0006799e955307cbfeb33d453a5a1a73c91797e9.png)

See [Bounding Box of Tag](https://forum.dynamobim.com/t/bounding-box-of-tag/19138/4) for the python code.

Let me know how it does,  
Steven

---

_[View the full topic](https://forum.dynamobim.com/t/schedule-door-tags-doors-in-linked-model-bim-360/28777)._
