# Revit- MSProject Link using Python

**URL:** <https://forum.dynamobim.com/t/revit-msproject-link-using-python/8268>\
**Category:** Developers\
**Created:** [December 15, 2016, 8:26pm UTC](https://forum.dynamobim.com/t/revit-msproject-link-using-python/8268 "2016-12-15T20:26:22Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![MOJTABA256](https://avatars.discourse-cdn.com/v4/letter/m/c77e96/32.png) [@MOJTABA256](https://forum.dynamobim.com/u/MOJTABA256)\
**Post date:** [December 15, 2016, 8:26pm UTC](https://forum.dynamobim.com/t/revit-msproject-link-using-python/8268/1 "2016-12-15T20:26:22Z")

</div>

Dear friends  
Hi

Does anybody know how to make a bidirectional link between Revit and MSProject using Python. I am going to develop a framework using Revit, Dynamo, and a web-based service for having Just-In-Time Manufacturing of building modules. For this purpose. I modeled several building modules in Revit with all their elements and extracted and sorted them into Excel using Dynamo. for the next step, I don’t know how to make a bidirectional link between Revit elements and MSProject for assigning time to each element. How can we export Revit elements and parameters into MSProject, modify them and then send them back into Revit. For Just In Time manufacturing, each Revit element needs a scheduling time received from MS Project. Could u please guide me? I attached my Dynamo and Revit file. Any help is appreciated in advance.

[JIT 4.dyn](https://forum.dynamobim.com/uploads/short-url/hONz1h1a888Xge3Z6gEr6GScwuL.dyn) (37.6 KB)

> **[Just In Time Manufacturing.rvt](https://www.dropbox.com/s/hjikhoqv6ag4azq/Just%20In%20Time%20Manufacturing.rvt?dl=0)**
>
> Shared with Dropbox
