Populating a Material Takeoff schedule with Custom entry fields

So I have a material Take-off schedule that’s sorted to only show specific categories at a time (for instance Paints are categorized as P-#) Is there a way to populate some of the built in material categories (Material: Manufacturer, etc) as well as custom made text parameters (Material: Paint Texture)? I have experience populating a key schedule using Archi-lab modules, but for real schedules I’m running into issues accessing the areas of the material schedule I need in order to know where to even start trying to input data.

This thread may help you decipher how to execute this:

1 Like

This is incredibly helpful. I can’t seem to get it to actually populate the schedulable field list, but this is more than enough to play around with and try and integrate into what I’ve already got.

Thank you!