# Multi-Category Material Takeoff to Excel or Google Sheets

**URL:** <https://forum.dynamobim.com/t/multi-category-material-takeoff-to-excel-or-google-sheets/15528>\
**Category:** Revit\
**Tags:** revit, excel, schedule\
**Created:** [October 10, 2017, 6:54pm UTC](https://forum.dynamobim.com/t/multi-category-material-takeoff-to-excel-or-google-sheets/15528 "2017-10-10T18:54:14Z")\
**Posts on this page:** 1\
**Showing post:** 8

<div class="post-metadata">

**Author:** ![Yna\_Db](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/yna_db/32/30641_2.png) [@Yna\_Db](https://forum.dynamobim.com/u/Yna_Db)\
**Post date:** [October 10, 2017, 7:16pm UTC](https://forum.dynamobim.com/t/multi-category-material-takeoff-to-excel-or-google-sheets/15528/8 "2017-10-10T19:16:51Z")

</div>

I will stop for today, I leave you with this link:

> [@Revit to Excel and Back Workflow Part1](https://forum.dynamobim.com/t/revit-to-excel-and-back-workflow-part1/10147):
>
> This is my attempt to provide a complete workflow process. My Setup: Revit 2016 Dynamo 1.2.1 Metric System Part1 Creating Excel File from Revit Type Family After putting together a graph, I had trouble rounding numbers/removing trailing zeros and got help with it on another post [with these results](https://forum.dynamobim.com/t/remove-trailing-zeros/1563/17). I wasn’t able to find the proper conversion factor for the HVAC/Pressure parameter so I used the Lunchbox node to get the document value. Main Graph Callout 1 [image] Callout 2 […

Don’t hesitate to use all available search tools since this topic is very well documented.

---

_[View the full topic](https://forum.dynamobim.com/t/multi-category-material-takeoff-to-excel-or-google-sheets/15528)._
