# Excel data integration with Revit schedules

**URL:** <https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920>\
**Category:** Uncategorized\
**Created:** [August 27, 2024, 3:31pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920 "2024-08-27T15:31:30Z")\
**Posts on this page:** 17\
**Page:** 1

<div class="post-metadata">

**Author:** ![tthalerBX8Y6](https://avatars.discourse-cdn.com/v4/letter/t/4491bb/32.png) [@tthalerBX8Y6](https://forum.dynamobim.com/u/tthalerBX8Y6)\
**Post date:** [August 27, 2024, 3:31pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/1 "2024-08-27T15:31:30Z")

</div>

To begin I am working in Revit 2024 and using Dynamo v.2.18.1.

I have a schedule in Revit that is already scheduling families that have been placed in a model. The schedule is organized by “fixture” & “face”. I have added additional fields to the schedule that correspond to an excel file that contains the data that I would like to be filled in. I thought that Dynamo would be the best solution for this so I utilized ChatGPT to help with step by step instructions. The problem that I have run into is that ChatGPT has given me nodes that either don’t exist or I get errors when connecting them together. I cant seem to figure out how to have dynamo read the Revit schedule and create a list of the families that are within that schedule.  
Any help is much appreciated!

---

<div class="post-metadata">

**Author:** ![bvs1982](https://avatars.discourse-cdn.com/v4/letter/b/43a26b/32.png) [@bvs1982](https://forum.dynamobim.com/u/bvs1982)\
**Post date:** [August 27, 2024, 6:02pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/2 "2024-08-27T18:02:45Z")

</div>

Look into Dynamo **dictionaries**.

If no one beats me to it i can post an example tomorrow.

---

<div class="post-metadata">

**Author:** ![Marcel\_Rijsmus](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/marcel_rijsmus/32/8539_2.png) [@Marcel\_Rijsmus](https://forum.dynamobim.com/u/Marcel_Rijsmus)\
**Post date:** [August 27, 2024, 7:36pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/3 "2024-08-27T19:36:52Z")

</div>

The thing is to connect the right information to the right object.  
You’ll have to think of a way to do that, because they all look sort of the same in a list.  
I use the objects Id or UniqueId to make sense of what i’m doing before it get’s chaotic.  
If you can find another unique combination of the values in the fields in excel and in the schedule that separates out every individual object, there might be an other (complex) way.

---

<div class="post-metadata">

**Author:** ![bvs1982](https://avatars.discourse-cdn.com/v4/letter/b/43a26b/32.png) [@bvs1982](https://forum.dynamobim.com/u/bvs1982)\
**Post date:** [August 28, 2024, 7:34am UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/4 "2024-08-28T07:34:39Z")

</div>

> [@tthalerBX8Y6](#):
>
> read the Revit schedule and create a list of the families that are within that schedule

 ![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/8/4/84557d8677cadacccb9acf6bd4082e7b215478ee.png)

To quote @Nick_Boyts

> [@Importing Excel Data into a Revit Schedule via Dynamo](https://forum.dynamobim.com/t/importing-excel-data-into-a-revit-schedule-via-dynamo/103826/3):
>
> Keep in mind a Revit schedule is just a view of project elements and their properties. You typically don’t add data directly to a Revit schedule, you add data to an element that is visible in a Revit schedule.

So you don’t need a Schedule to populate data from Excel.

> [@bvs1982](#):
>
> If no one beats me to it i can post an example tomorrow.

 ![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/d/b/db20458df061db63236e529b7b8ed981c84d9fe9.png)

---

<div class="post-metadata">

**Author:** ![tthalerBX8Y6](https://avatars.discourse-cdn.com/v4/letter/t/4491bb/32.png) [@tthalerBX8Y6](https://forum.dynamobim.com/u/tthalerBX8Y6)\
**Post date:** [August 28, 2024, 1:12pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/5 "2024-08-28T13:12:00Z")

</div>

If I am understanding it correctly what you have shown above will populate which ever schedule column I choose with the data from the excel file?

Ultimately what Id like is for Dynamo to grab the data from the excel file based on a combination of the “fixture” & “face” that is being scheduled in Revit.

For example if the Revit schedule is showing Fixture A & Face B, I want Dynamo to grab the data in the excel file that is for Fixture A & Face B. The excel file contains over 400 combinations so I need Dynamo to be selective and just grab what is needed. I don’t know if this will need to be achieved using a python script or not.

Does that make sense?

---

<div class="post-metadata">

**Author:** ![Nick\_Boyts](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/nick_boyts/32/76313_2.png) [@Nick\_Boyts](https://forum.dynamobim.com/u/Nick_Boyts)\
**Post date:** [August 28, 2024, 1:51pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/6 "2024-08-28T13:51:54Z")

</div>

The easiest thing to do is combine your two values into one (i.e. Fixture + Face = FixtureFace) so that you can create a dictionary of all 400 unique combinations as single item keys. Then you just get the two values from each element, combine them into the singular combination, and use your dictionary to get the appropriate parameter values.

---

<div class="post-metadata">

**Author:** ![bvs1982](https://avatars.discourse-cdn.com/v4/letter/b/43a26b/32.png) [@bvs1982](https://forum.dynamobim.com/u/bvs1982)\
**Post date:** [August 28, 2024, 1:53pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/7 "2024-08-28T13:53:31Z")

</div>

@Nick_Boyts beat me to it. That is exactly what i wanted to suggest.

---

<div class="post-metadata">

**Author:** ![tthalerBX8Y6](https://avatars.discourse-cdn.com/v4/letter/t/4491bb/32.png) [@tthalerBX8Y6](https://forum.dynamobim.com/u/tthalerBX8Y6)\
**Post date:** [August 28, 2024, 2:42pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/8 "2024-08-28T14:42:08Z")

</div>

I am very new to Dynamo so I’m going to need a little more explanation than that. Would I have to combine the two values together in just the excel file or in Revit as well?

---

<div class="post-metadata">

**Author:** ![Nick\_Boyts](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/nick_boyts/32/76313_2.png) [@Nick\_Boyts](https://forum.dynamobim.com/u/Nick_Boyts)\
**Post date:** [August 28, 2024, 2:46pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/9 "2024-08-28T14:46:33Z")

</div>

You would only combine them for the dictionary. You would still have individual values in Excel and Revit, but would combine them to have a singular key for each dictionary item. I suggest you look into dictionaries to get a better understanding of how they work and what they do. That should hopefully clear things up.

---

<div class="post-metadata">

**Author:** ![bvs1982](https://avatars.discourse-cdn.com/v4/letter/b/43a26b/32.png) [@bvs1982](https://forum.dynamobim.com/u/bvs1982)\
**Post date:** [August 28, 2024, 3:39pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/10 "2024-08-28T15:39:18Z")

</div>

With this example and my previous post you should be able to figure it out.

 ![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/2/b/2ba0230351a16e8bc6a6854cdb7882d852179e69.png)

> [@tthalerBX8Y6](#):
>
> Would I have to combine the two values together in just the excel file or in Revit as well?

In Dynamo, but the values have to exist in the Excel file as well.

Start setting it up and get back to us when you get stuck. Good luck!

---

<div class="post-metadata">

**Author:** ![Marcel\_Rijsmus](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/marcel_rijsmus/32/8539_2.png) [@Marcel\_Rijsmus](https://forum.dynamobim.com/u/Marcel_Rijsmus)\
**Post date:** [August 28, 2024, 6:38pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/11 "2024-08-28T18:38:51Z")

</div>

Advanced users understand this  
This makes no sense to beginners  
DS is blahblah to them

---

<div class="post-metadata">

**Author:** ![bvs1982](https://avatars.discourse-cdn.com/v4/letter/b/43a26b/32.png) [@bvs1982](https://forum.dynamobim.com/u/bvs1982)\
**Post date:** [August 28, 2024, 6:41pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/12 "2024-08-28T18:41:00Z")

</div>

Maybe, maybe not. In any case it doesnt hurt to post these examples. I learned Dynamo like this (following examples).

---

<div class="post-metadata">

**Author:** ![Marcel\_Rijsmus](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/marcel_rijsmus/32/8539_2.png) [@Marcel\_Rijsmus](https://forum.dynamobim.com/u/Marcel_Rijsmus)\
**Post date:** [August 28, 2024, 6:41pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/13 "2024-08-28T18:41:49Z")

</div>

Same here, but took some time

---

<div class="post-metadata">

**Author:** ![tthalerBX8Y6](https://avatars.discourse-cdn.com/v4/letter/t/4491bb/32.png) [@tthalerBX8Y6](https://forum.dynamobim.com/u/tthalerBX8Y6)\
**Post date:** [September 4, 2024, 6:51pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/14 "2024-09-04T18:51:24Z")

</div>

![InkedFinal_2024-09-04_02-46-23_LI](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/4/c/4cae46e70aef1f499c9cead73e64529e48e557f2.jpeg)

I’ve made it this far. What I need help with now is figuring out a way for the “X’s” to fill in to corresponding columns in the Revit schedule. Can anyone help me get the rest of the way there or am I way off?

---

<div class="post-metadata">

**Author:** ![Marcel\_Rijsmus](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/marcel_rijsmus/32/8539_2.png) [@Marcel\_Rijsmus](https://forum.dynamobim.com/u/Marcel_Rijsmus)\
**Post date:** [September 4, 2024, 6:55pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/15 "2024-09-04T18:55:30Z")

</div>

Did you use a shared parameter?

 ![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/6/2/6245fdc0d631298153823a03fcc1b7d1ad414a4c.jpeg)

---

<div class="post-metadata">

**Author:** ![tthalerBX8Y6](https://avatars.discourse-cdn.com/v4/letter/t/4491bb/32.png) [@tthalerBX8Y6](https://forum.dynamobim.com/u/tthalerBX8Y6)\
**Post date:** [September 5, 2024, 1:48pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/16 "2024-09-05T13:48:43Z")

</div>

![Schedule](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/d/9/d9db70343ab0eb5467f380ba73a23c58de16506d.png)  
I have parameters set up in the schedule for the columns. The same columns are also in the excel file, I just need the “X’s” to fill in the Revit schedule. Not sure if that answers your question or not.

---

<div class="post-metadata">

**Author:** ![Nick\_Boyts](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/nick_boyts/32/76313_2.png) [@Nick\_Boyts](https://forum.dynamobim.com/u/Nick_Boyts)\
**Post date:** [September 5, 2024, 2:58pm UTC](https://forum.dynamobim.com/t/excel-data-integration-with-revit-schedules/103920/17 "2024-09-05T14:58:00Z")

</div>

There are a _ton_ of topics on the forum already that deal with transferring Excel data to matching Revit elements. Please work your way through some of them and try to make attempts at the existing solutions before asking for help. If you get stuck on something specific, we can help you with that.