# Dynamo for Clash Detective in Revit

**URL:** <https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453>\
**Category:** Revit\
**Tags:** revit, mep, excel, dynamo\
**Created:** [September 21, 2021, 11:39pm UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453 "2021-09-21T23:39:10Z")\
**Posts on this page:** 7\
**Page:** 1

<div class="post-metadata">

**Author:** ![c.cerquera](https://avatars.discourse-cdn.com/v4/letter/c/a3d4f5/32.png) [@c.cerquera](https://forum.dynamobim.com/u/c.cerquera)\
**Post date:** [September 21, 2021, 11:39pm UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/1 "2021-09-21T23:39:10Z")

</div>

Hi guys, I’m new to dynamo… I have been trying to align the clash points to the Revit model but it is impossible (for me). I have tried a lot of things but I think it is beyond my poor understanding of the program. If anyone could help me or guide me, I would be more than grateful.

 ![Dynamo_ClashDetective](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/3/0/30291b1eb2ee3eb5056bc10f99f5612a319bd19f.png)

---

<div class="post-metadata">

**Author:** ![c.cerquera](https://avatars.discourse-cdn.com/v4/letter/c/a3d4f5/32.png) [@c.cerquera](https://forum.dynamobim.com/u/c.cerquera)\
**Post date:** [September 21, 2021, 11:42pm UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/2 "2021-09-21T23:42:17Z")

</div>

![Revit_Dynamo](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/e/9/e91bfa3d33d97979f48d0496a3a04a347d2475f4.png)

---

<div class="post-metadata">

**Author:** ![ScottL](https://avatars.discourse-cdn.com/v4/letter/s/97f17d/32.png) [@ScottL](https://forum.dynamobim.com/u/ScottL)\
**Post date:** [September 22, 2021, 12:48am UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/3 "2021-09-22T00:48:51Z")

</div>

Hello,

Can you show us what the Excel sheet you’re inputting into the graph looks like?  
Please explain how the Clash Points were created. Are they from a Navisworks clash?  
Also, please describe what output you want in your model? Are you trying to place an Element at each of these clash points? Are you trying to create a 3D view at each clash?

Thanks!

---

<div class="post-metadata">

**Author:** ![GavinNicholls](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/gavinnicholls/32/190442_2.png) [@GavinNicholls](https://forum.dynamobim.com/u/GavinNicholls)\
**Post date:** [September 22, 2021, 1:36am UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/4 "2021-09-22T01:36:09Z")

</div>

Try my package (Crumple). I have a node in there that converts real world coordinates to Revit coordinates by reading the project base point/survey point values such as rotation and N/E. It works under the assumption your coordination points match the coordinates in Revit (e.g. 0,0,0 in your coordination environment is 0,0,0 in your Revit model’s coordinates).

---

<div class="post-metadata">

**Author:** ![Vladimir](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/vladimir/32/147600_2.png) [@Vladimir](https://forum.dynamobim.com/u/Vladimir)\
**Post date:** [September 22, 2021, 11:29am UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/5 "2021-09-22T11:29:19Z")

</div>

@c.cerquera ,  
share dyn and rvt files, so we can see how we can help.

---

<div class="post-metadata">

**Author:** ![c.cerquera](https://avatars.discourse-cdn.com/v4/letter/c/a3d4f5/32.png) [@c.cerquera](https://forum.dynamobim.com/u/c.cerquera)\
**Post date:** [September 22, 2021, 12:51pm UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/6 "2021-09-22T12:51:29Z")

</div>

Hi guys. First of all, thanks for your support, I tried not to move in Navis the units and exporting the clash report once again, and surprisingly it did work !  
ScottL, I was trying to replicate a video tutorial made for Gavin in his Youtube channel. I made some variations because I couldn’t find a node that was necessary to align the coordinates. The Revit models were modeled with shared coordinates (N/S: -89, E/W: 79, Z:429) and it was impossible for me to fix this in dynamo.  
Gavin, it is amazing a reply for you, I have been following you for a couple of years, thank you so much for your support. I’m attending an online Dynamo course because my crush on this program.  
Vladimir, I appreciate your help but the Revit models are not mine, and I cannot shared those kind of information.  
Greetings from Colombia!

 ![Resolved](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/4/1/415185d3d73c0b9ec4e97cc1feb856995ac150c0.jpeg)

---

<div class="post-metadata">

**Author:** ![GavinNicholls](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.dynamobim.com/gavinnicholls/32/190442_2.png) [@GavinNicholls](https://forum.dynamobim.com/u/GavinNicholls)\
**Post date:** [September 23, 2021, 2:59am UTC](https://forum.dynamobim.com/t/dynamo-for-clash-detective-in-revit/68453/7 "2021-09-23T02:59:21Z")

</div>

Glad to meet a follower!

I’ve got a bit more time to post today so this is the specific node. Be aware that currently it uses manual unit correction, which by default is from feet to millimeters (\*304.8). This is a lazy method, I hope to return to it in future to detect the units in both a way that pre-2022 and 2022+ versions can detect. There were changes in unit conversion due to forge API in 2022 that I’m working around with this hack currently.

![image](https://us1.discourse-cdn.com/flex022/uploads/dynamobim/original/3X/c/9/c9f981d41f80eee854e0cbebe4f6f39f9203210c.png)
